IQRA UNIVERSITY, PESHAWAR CAMPUS
Iqra university students
visited
GHAZI BAROTHA Hydropower Project on 13th May 2010.
|
The GHAZI BAROTHA hydropower project is a major run-of-the river
environmentally sustainable power project, designed to meet the acute
shortage of peak power demand in our country.
The project is based on the utilization of the head
available in the INDUS RIVER between TARBELA DAM near GHAZI confluence
with the HARO RIVER and the INDUS RIVER near BAROTHA. In this reach the
INDUS RIVER drops by about 76m in a distance of 63km.
Location:
Around 100km from Islamabad, on the Indus River in Khyber Pk, 7 km
downstream from
the Tarbela dam.
Built in:
2003,
Power Generation:
1450MW
|
| Total images: 15 | Last update: 5/28/10 12:49 PM
| IQRA University, Peshawar Campus. | Help |